Torrance Bail Bonds

Luminaries from across the state gathered on Wednesday to celebrate breaking ground on the Torrance Regional Transit Center, the future terminus for the LA Metro Green Line extension. This is a win-win-win. Who was credited by Brown with fighting to secure additional funding to complete the project as part of Garcetti’s “Twenty-Eight by ’28” plan. The Green Line extension is projected to be completed by the 2028 Los Angeles Summer Olympics. The gathered officials took the opportunity to stump against the SB 1 repeal effort in fact, which has been used as a rallying point for conservative politicians throughout the campaign season. This is improving transportation, improving quality of

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • LinkedIn App Icon
  • Twitter Basic Square
  • Google+ Basic Square
  • RSS Classic